FedRAMP & GovRAMP Authorization

Achieve FedRAMP Moderate, FedRAMP High, or StateRAMP authorization in 12-18 months -- 3PAO-coordinated implementation, continuous monitoring, and ongoing ATO maintenance.

Concentric hexagonal lattice rings representing layered compliance controls for FedRAMP

Government Cloud Authorization Done Right

The heavy lift is the documentation package: System Security Plan (SSP) authoring, NIST 800-53 Rev 5 control implementation and control narratives, policies, and the evidence behind them. FedRAMP and GovRAMP (formerly StateRAMP) are the prerequisites for selling to U.S. federal and state government agencies. They are not optional, they are not fast, and they are not cheap -- a typical FedRAMP Moderate authorization spans 12-18 months and runs into the high-six-figures or low-seven-figures all-in. The decision to pursue FedRAMP is a go-to-market commitment, not a checkbox item. We build the package and run the program when the path makes sense for your business.

Our FedRAMP playbook starts with sponsorship strategy: under OMB M-24-15, FedRAMP authorizations are issued by agencies, and a multi-agency authorization can be issued by any group of agencies. An agency authorization requires NIST 800-53 control implementation across the full Moderate baseline (300+ controls) and a willing federal sponsor. It is the path to a first contract; other agencies authorize separately, and reuse can expand later. Most early FedRAMP candidates start with a lead agency sponsor, then expand. GovRAMP follows a similar model but state-by-state, with the GovRAMP PMO handling reciprocity.

Implementation is the engineering-heavy phase: System Security Plan (SSP) authoring, control implementation across NIST 800-53 Rev 5 (with FedRAMP-specific overlays), 3PAO (third-party assessment organization) coordination, Plan of Action and Milestones (POA&M) management, and continuous monitoring infrastructure that satisfies the monthly vulnerability scanning, annual penetration testing, and ongoing change-management evidence requirements. Our SREs build this in code -- the same Terraform modules that provision your AWS GovCloud environment also generate the configuration baseline evidence FedRAMP requires.

Layered compliance program architecture with audit-ready control evidence

Why Choose Our FedRAMP & GovRAMP Authorization

Engineering rigor, audit-ready process, and operational depth across cloud, SaaS, and software delivery

Sponsorship Strategy

Agency vs multi-agency authorization decision support, federal sponsor identification, and FedRAMP marketplace positioning. Most customers benefit from starting with a lead agency sponsor, then expanding reuse once revenue justifies.

Sponsorship Strategy

Engineering-Led Implementation

NIST 800-53 Rev 5 controls implemented in Terraform — not bolted on. AWS GovCloud architecture, FIPS 140-2 validated cryptography, SSP authored with control responsibility matrix.

Engineering-Led Implementation

3PAO Coordination

We work with FedRAMP-accredited 3PAOs (e.g., Coalfire, A-LIGN, Schellman) and manage the assessment cycle end-to-end. Pre-assessment, evidence package, on-site coordination, POA&M response. We build your documentation package and run your pre-assessment. We're not a 3PAO; an independent, accredited 3PAO performs the assessment.

3PAO Coordination

Continuous Monitoring

Monthly vulnerability scans, annual penetration testing, ongoing change-management evidence, and the ConMon submissions FedRAMP and GovRAMP PMOs require. Audit-ready year-round.

Continuous Monitoring

Our FedRAMP & GovRAMP Process

From sponsorship strategy to authorization in 12-18 months

1

Sponsorship & Scoping

Months 1-2: identify federal sponsor (or StateRAMP equivalent), choose impact level (Moderate vs High), define system boundary, gap-analyze current controls against NIST 800-53 Rev 5 baseline. Output: a SOW with explicit timeline and cost commitments.

2

Architecture & SSP Authoring

Months 2-5: AWS GovCloud (or Azure Government) architecture design, FIPS 140-2 cryptographic implementation, full System Security Plan with control responsibility matrix, configuration baseline documentation.

3

Control Implementation

Months 4-9: implement the 300+ Moderate baseline controls (or 400+ High baseline) in Terraform and supporting documentation. Continuous monitoring infrastructure deployment. Evidence collection automation.

4

3PAO Assessment

Months 9-13: coordinate 3PAO assessment, manage on-site interviews, respond to findings via POA&M. Typical 3-4 month assessment cycle with ongoing remediation.

5

Authorization & ConMon

The package is submitted to the lead agency, or to the agencies issuing a multi-agency authorization, for the authorization decision. Ongoing continuous monitoring (monthly scans, annual pen tests, ConMon reports) maintains authorization year-over-year.

DIY FedRAMP vs. Specialist FedRAMP Engagement

Why FedRAMP isn't where you DIY your first compliance program

Timeline to Authorization

DIY or Generalist Compliance Vendor
24-36 months with high failure rate; budget overruns common
Jacobian Services
12-18 months with explicit go/no-go gates and committed timeline

Control Implementation

DIY or Generalist Compliance Vendor
Documentation-heavy with manual evidence collection
Jacobian Services
Controls implemented in Terraform with auto-generated evidence

3PAO Relationship

DIY or Generalist Compliance Vendor
First-time engagement, learning the process during the assessment
Jacobian Services
Pre-existing relationships with 3-4 FedRAMP 3PAOs; we know the assessor scoring patterns

AWS GovCloud Setup

DIY or Generalist Compliance Vendor
Often a 6-month subsidiary project that delays the assessment
Jacobian Services
GovCloud architecture is standard playbook; deployed and validated in 4-6 weeks

Ongoing ConMon

DIY or Generalist Compliance Vendor
Manual monthly scan reports, often late or incomplete
Jacobian Services
Automated ConMon evidence pipeline; monthly submissions on time, year over year

A-LIGN vs Coalfire: How to Choose a FedRAMP 3PAO

Your 3PAO choice follows your authorization path. Under OMB M-24-15, FedRAMP authorizations are issued by agencies, and a multi-agency authorization can be issued by any group of agencies; the Joint Authorization Board's provisional ATO belongs to the prior FedRAMP structure. FedRAMP now runs Rev5 alongside FedRAMP 20x.

Check each firm on the FedRAMP Marketplace assessor list. As of the Marketplace data we checked, A-LIGN and Coalfire are both listed as FedRAMP-recognized 3PAOs.

FedRAMP's 3PAO guidance cites A2LA R311: a 3PAO that is part of an organization offering consulting services may not assess a cloud system it consulted on. Decide early who builds your package and who assesses it.

We build your documentation package and run your pre-assessment. We're not a 3PAO; an independent, accredited 3PAO performs the assessment.

FedRAMP Authorization Playbook
Whitepaper

FedRAMP Authorization Playbook

Read our FedRAMP playbook -- agency vs multi-agency authorization sponsorship strategy, AWS GovCloud architecture, NIST 800-53 Rev 5 controls, 3PAO process, ConMon obligations.

Read the whitepaper

FedRAMP & GovRAMP FAQs

What CTOs and compliance leads ask before committing to FedRAMP

All-in (engineering, advisory, 3PAO, ongoing ConMon) typically runs $750K-$2M for the first year for a mid-stage company, with $250K-$500K annual ongoing cost. The variability comes from scope (number of services in the boundary), starting maturity (a SOC 2 Type II program is the right precondition), and choice of cloud (AWS GovCloud carries premium pricing). FedRAMP High roughly doubles these numbers. The decision is fundamentally a go-to-market commitment -- the math works only if government revenue is in your 3-year plan.

Start with a lead agency sponsor: identify one federal sponsor, complete the assessment, and get that authorization, then expand reuse as other agencies authorize. Under OMB M-24-15, FedRAMP authorizations are issued by agencies, and a multi-agency authorization can be issued by any group of agencies. Most early-stage FedRAMP candidates start with a lead agency sponsor to land the first customer, then expand reuse once revenue justifies it. We help with the decision based on your actual customer pipeline.

GovRAMP applies the FedRAMP control framework (NIST 800-53) to state government cloud procurement. The GovRAMP PMO maintains a marketplace and reciprocity scheme so a single authorization can serve multiple states. The technical requirements are nearly identical to FedRAMP Moderate; the differences are in submission process, sponsorship model (typically a state agency rather than federal), and ongoing fees. Some states (e.g., Texas TX-RAMP, California Cal-Secure) maintain parallel state-specific programs that overlap with GovRAMP but aren't identical.

Yes. SOC 2 Type II is effectively a prerequisite -- the operational discipline required for FedRAMP (configuration management, vendor risk, access reviews, incident response, change management) is a superset of SOC 2 Common Criteria. We've never seen a successful FedRAMP path that started without SOC 2 maturity. Customers with SOC 2 Type II in place can typically reach FedRAMP Moderate in 12-18 months; customers without it should plan 24-30 months and budget for the SOC 2 work first.

Both. AWS GovCloud (US-East and US-West regions) is the most common choice for FedRAMP Moderate and serves the majority of our engagements. Azure Government covers customers with existing Microsoft ecosystem investments. Google Cloud Assured Workloads for Government is supported for greenfield workloads but less common in our customer base. The choice is driven by existing engineering ecosystem, customer requirements, and pricing -- we don't have a vendor preference.

FedRAMP High applies to systems handling sensitive but unclassified information (Controlled Unclassified Information / CUI) and adds another 50+ controls beyond Moderate. IL5 (Impact Level 5) is the DoD's parallel framework with additional requirements for DoD-specific data. Both are achievable but require committed government revenue to justify the cost. We've supported customers through Moderate-to-High upgrades; the timeline is typically 6-9 months on top of an existing Moderate authorization.

Ready for FedRAMP Authorization?

Engage our team for sponsorship strategy and a 12-18 month authorization roadmap.